Tenders Documents

MISURATA CO-GENERATION POWER PLANT (700 MW + 100,000 M3/DAY) TENDER DOCUMENTS

COMPLETED 2010

PGESCo scope included conceptual design development and EPC tender preparation by PGESCo’s team at the Cairo office.

SABHA AND SARIR SIMPLE CYCLE POWER PLANTS TENDER DOCUMENTS

COMPLETED 2009

PGESCo scope included conceptual design development and tender document preparation for six packages and purchase orders. They also assisted the Owner with bid evaluations and award recommendation report

TUBROK CO-GENERATION POWER PLANT (600 MW + 100,000 M3/DAY) TENDER DOCUMENTS

COMPLETED 2010

PGESCo scope included conceptual design development and tender document preparation for six packages and purchase orders. They also assisted the Owner with bid evaluations and award recommendation report preparation.

MASTER PLAN OF THE MAIN SUPPLY AND TRANSMISSION GAS PIPELINES AND CITY GAS DISTRIBUTION NETWORKS STUDY

COMPLETED 2009

The main report objective was to determine the optimum Gas Master Plan in terms of required transmission capacity taking into account gas demand, gas supply and their locations. PGESCo teamed with ACESCo/Tractabel to provide the base design and tender documents for the construction of four transmission pipelines and two area distribution networks.

FEASIBILITY STUDIES OF TOBRUK, TRIPOLI AND BENGHAZI DESALINATION AND POWER CO-GENERATION PLANTS STUDY

COMPLETED 2009

The feasibility studies included technical and economical optimization for each site (Tobruk, Tripoli and Benghazi) to allow for the most flexible water and power production. The cogeneration plants configuration varied from 400 MW to 750 MW power production and 250,000 m3/day to 500,000m3/day water production.