Benghazi North Power Plant 2 X 150 MW

PGESCo scope included design review, site supervision and project management of Benghazi North 2 X 150 MW project. The scope also included plant equipment material inspection and performance testing.

Zawia Extension Power plant 3 X 150 MW

PGESCo scope included design review, site supervision and project management of Zawia Combined Cycle project. The scope also included plant equipment material inspection and performance testing.

Benghazi Power Plant 750 MW

PGESCo scope included design review, site supervision and project management of Benghazi Combined Cycle Power Plant 2X2X1. The scope also included plant equipment material inspection and performance testing.

Misurata Power Plant 750 MW

PGESCo scope included design review, site supervision and project management of Misurata Combined Cycle Power Plant 2X2X1. The scope also included plant equipment material inspection and performance testing.

Zwitina Power Plant add-on 250 MW

PGESCo scope included design review, site supervision and project management of Zwitina Combined Cycle 250 MW add-on Project. The scope also included plant material inspection and performance testing for all plant equipment. The scope is to convert the existing 2 X 250 MW Gas Turbine Power Plant into a 2X2X1 Combined Cycle Power Plant for a total capacity of 750 MW.

PGESCo teamed with Arabian Consultancy Engineering Services “ACESCo” in Libya

WESTERN MOUNTAIN EXTENSION POWER PLANT 2 X 156 MW
Completed 2013

PGESCo scope included design review, site supervision and project management of Western Mountain 2 X 156 MW project. The scope also included plant equipment material inspection and performance testing.

SARIR POWER PLANT 3 X 285 MW
Completed 2013

PGESCo scope included design review, site supervision and project management of Sarir 3 X 285 MW project. The scope also included plant equipment material inspection and performance testing.

ZWITINA POWER PLANT 2 X 285 MW
Completed 2011

PGESCo scope included design review, site supervision and project management of Zwitina 2 X 285 MW project. The scope also included plant equipment material inspection and performance testing.

ZAWIA POWER PLANT 2 X 150 MW
Completed 2007

PGESCo scope included design review, site supervision and project management of Zawia 2 X 150 MW project. The scope also included plant equipment material inspection and performance testing.

WESTERN MOUNTAIN POWER PLANT 4 X 156 MW
Completed 2007

PGESCo scope included design review, site supervision and project management of Western Mountain 4 X 156 MW project. The scope also included plant equipment material inspection and performance testing.

OBARI POWER PLANT 4 X 160 MW
On-going (on hold due to Libyan circumstances)

PGESCo scope included design review, site supervision and project management of Obari 4 X 160 MW (crude oil fired) project. The scope also included plant equipment material inspection and performance testing.

Substations in Libya

14 X 220 KV SUBSTATIONS
On-going
PGESCo scope included design review, site supervision and project management of fourteen (14) 220 kV substations. The scope also included material inspection. The project consists of seven 220 kV substations throughout Libya.

3 X 220/400 KV SUBSTATIONS – SABHA, TUBROK AND MELITA
On-going
PGESCo scope included design review, site supervision and project management of three (3) 220/400 kV substations. The scope also included material inspection

7 X 400 KV SUBSTATIONS
Completed 2008
PGESCo scope included design review, site supervision and project management of the project. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas). The project consists of seven (7) 400/220 kV substations throughout Libya.

 

OHTL Projects Libya

SABHA – GAMRA 400 KV OHTL

Completed 2014
PGESCo scope included design review, site supervision and project management of 400 kV overhead transmission line (260 km). The scope also included plant equipment material inspection and performance testing.

1000 KM 400 kV OHTL

Completed 2008
PGESCo scope included design review, site supervision and project management of the project. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas). The project consists of two (2) 400 kV overhead transmission lines with total length of 1000 km. The first line is Zawia-Sidi Banour (500 km) and the second line is Sirt-Agdabia (500 km).

OHTL-Projects-Libya

Zawia Desalination Project (80,000 M3/Day)

Complete 2010
PGESCo scope included design review, site supervision and project management of Zawia Sea Water Desalination Project. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).

Derna Sea Water Desalination Project (40,000 M3/DAY)

Completed 2010
PGESCo scope included design review, site supervision and project management of Derna Sea Water Desalination Project. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).

Sousa Sea Water Desalination Project (40,000 M3/Day)

Completed 2010
PGESCo scope included design review, site supervision and project management of Sousa Sea Water Desalination Project. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).

Abu Traba Sea Water Desalination Project (40,000 M3/DAY)

Completed 2007
PGESCo scope included design review, site supervision and project management of Abu Traba Sea Water Desalination Plant. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).

The project capacity is 2 X 20,000 M3/DAY using MED (Multiple Effect Distillation) units.

Economical Studies Libya

OBARI SIMPLE CYCLE CONVERSION TO COMBINED CYCLE FEASIBILITY STUDY

Year: 2013
Client/Project: General Electricity Company of Libya/Arabian Consulting Engineering Services Company / LIBYA
Description: This study was prepared in order to compare the economic aspects of two different approaches of upgrading the capacity of Obari simple cycle power plant to combined cycle power plant.

SARIR SIMPLE CYCLE CONVERSION TO COMBINED CYCLE FEASIBILITY STUDY

Year: 2013
Client/Project: General Electricity Company of Libya/Arabian Consulting Engineering Services
Company/ LIBYA
Description: This study was prepared in order to compare the economic aspects of two different approaches of upgrading the capacity of Sarir simple cycle power plant to combined cycle power plant.

WESTERN MOUNTAIN SIMPLE CYCLE CONVERSION TO COMBINED CYCLE FEASIBILITY STUDY

Year: 2013
Client/Project: General Electricity Company of Libya/Arabian Consulting Engineering Services
Company / LIBYA
Description: This study was prepared in order to compare the economic aspects of two different approaches of upgrading the capacity of Western Mountain simple cycle power plant to combined cycle power plant.

BOMBA DESALINATION PROJECT FEASIBILITY STUDY

Year: 2010
Customer/Project: General Electricity Company of Libya/Arabian Consulting Engineering Services
Company/LIBYA
Description: This study was prepared in order to compare the economical aspects of two different approaches of upgrading the capacity of Bomba desalination plant.