Plant Description
- One (1) STG (GE Steam Turbine Generator equipment package), including all required Balance of Plant Systems
- Four (4) Heat Recovery Steam Generators (HRSGs), including all required auxiliary systems
- One (1) Air Cooled Condenser
- All Steam Cycle Piping and Piping Support Systems
- Power generated is stepped up through main Transformers and fed to the Utility 220 kV Grid, via an Extension to the Existing Gas Insulated Switchgear (GIS) Switchyard
- The Plant uses Ground Water as the Raw Water Source
Major plant commodities/systems:
- Power Block (Steam Turbine, Generator and Auxiliaries)
- Air Cooled Condensers
- Balance of Plant (Transformers, Switchgear, DCS and Balance of Mechanical/Electrical systems)
- 220 kV Gas Insulated Switchgear (GIS), extension
Project Details | |
Owner | East Delta Electricity Production Company |
Client | Orascom Construction (GE’s partner in the EPC consortium) |
Location | Damietta, Egypt |
Date of Award | August 2015 |
Contractual Duration | 29 Months |
Scope | Detailed Design of all Balance of Plant Systems, Civil Designs, Support to Procurement, Construction Management and Startup |