Plant Description
- Two (2) STGs (GE Steam Turbine Generator equipment package), including all required balance of plant systems
- Eight (8) HRSGs, including all required balance of plant systems
- Two (2) air cooled condensers
- All steam cycle piping and piping support systems
- Chemical feed system
- Power generated is stepped up through main transformers and fed to the utility 220 kV grid, via an extension to the existing gas-insulated switchgear (GIS) switchyard
- The plant uses ground water as the raw water source
Major plant commodities/systems:
- Power Block (Steam Turbine, Generator and Auxiliaries)
- Air Cooled Condensers
- Balance of plant (Transformers, Switchgear, DCS and Balance of Mechanical/Electrical systems)
- 220 kV Gas Insulated Switchgear (GIS), extension
Project Details | |
Owner | Upper Egypt Electricity Production Company |
Client | Orascom Construction (GE’S partner in the EPC consortium) |
Location | Assiut, Egypt |
Date of Award | December, 2015 |
Contractual Duration | 29 Months |
Scope | Detailed Design of all Balance of Plant Systems, Civil Designs, Support to Procurement, Construction Management and startup |