Giza North Water Treatment Facilities

Region:

Status:

Giza North power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Giza North power project includes:

Intake Design Open intake
Chlorination System Chlorine Gas feed system 3 x 1200 kg Cl2/h
Raw Water Pretreatment System Clarification + Ultra filtration (UF) 3 x 2520 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 3 x 2040 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 5280 m3/day
Potable water treatment UF + activated carbon filtration+ chlorination 80 m3/day
Sewage treatment plant Extended aeration 80 m3/day
Project Details
Owner Cairo Electricity Production Company
Location Giza, Egypt
Date of Award March 2013
Contractual Duration 17 Months
Scope Engineering, Procurement, and Construction Management Services