Cairo North power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. River water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Cairo North power project includes:
Intake Design | Open intake | |
Chlorination System | Hypochlorite Solution injection system | |
Raw Water Pretreatment System | Clarification / Multi Media Filtration /Sludge Dewatering | 2 x 1680 m3/day |
Demineralization System | Cation / degasifier /anion / mixed bed deionizer | 2 x 1680 m3/day |
Waste water treatment system | API Oil separation / DAF oil separation | 2400 m3/day |
Project Details | |
Owner | Cairo Electricity Production Company |
Location | Cairo, Egypt |
Date of Award | December 2002 |
Contractual Duration | 18 Months |
Scope | Engineering, Procurement, and Construction Management Services |