Al Atf power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. River water from Nile River Rosetta Branch is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The desalination and water/waste water treatment installed in Al Atf power project includes:
Intake Design |
Open intake |
|
Chlorination System |
Hypochlorite Solution injection system |
|
Raw Water Pretreatment System |
Clarification / Multi Media Filtration |
2 x 80 m3/hr |
Demineralization System |
Cation / degasifier /anion / mixed bed deionizer |
2 x 1300 m3/day |
Waste water treatment system |
Oil separation / clarification / filtration / pH adjustment |