New Assiut Power Plant 1000 MW – Fast Track

 Plant Description

  • Eight (8) CTGs, GE (PG 9171E) dual fired Gas Turbine Generator equipment package with all required Balance of Plant systems.
  • The plant uses heavy fuel oil (Mazout) as the main fuel and light fuel oil (Solar) as the secondary fuel.
  • Power generated is stepped up through main transformers and fed to the utility 220 kV grid, via a Gas-Insulated Switchgear (GIS) switchyard.
  • The plant uses ground water as its water source.

 Major plant commodities/systems:

  • Power Block (Gas Turbine, Generator and Auxiliaries)
  • Balance of Plant (Transformers, Switchgears, Diesel Generator, Auxiliaries, Boiler, DCS and Balance of Mechanical / Electrical systems)
  • 220 kV GIS
  • Heavy Fuel Oil Treatment Plant
  • Fuel Tank Farm
  • Water Treatment Plant

New West Damietta 500 MW – Fast Track

Plant Description

  • Four (4) CTGs, GE (PG 9171E) Gas Fired Turbine Generator Equipment package with all required Balance of plant systems.
  • The plant runs on fuel gas only.
  • Power generated is stepped up through main transformers and fed to the utility 220 kV grid, via a Gas-Insulated Switchgear (GIS) switchyard.
  • The plant uses ground water as its water source.

Major Plant Commodities/ Systems:

  • Power Block (Gas Turbine, Generator and Auxiliaries)
  • Balance of Plant (Transformers, Switchgears, Diesel Generator, and Balance of Mechanical / Electrical systems)
  • 220 kV (GIS)
  • Water Treatment Plant

6 October II Power Plant 4X160 MW

The 6 of October II Extension power project is a simple cycle power generation project located beside the Extra High Voltage Researches Lab fence area, 25 km from Cairo on the Cairo –Alexandria desert road. It consists of four indoor gas turbines with a total capacity of 640 MW. The facility includes all necessary auxiliary equipment including a new natural gas reducing and handling facility. Power generated at the manufacturer standard voltage for the CTG is stepped up through main transformers and fed to the utility unified grid via a 220 kV Gas Insulated Switchyard (GIS). The project was executed through a lump sum turnkey contract.

The project utilized an EPC contracting plan. As the Owner authorized representative, PGESCo was responsible for the overall project management, design review, and construction management as well as startup and commissioning management.

6 October I Power Plant 4X150 MW

The 6 of October I power project is simple cycle power generation project located inside the Extra High Voltage Researches Lab fence area, 25 km from Cairo on the Cairo –Alexandria desert road.

The project consists of four indoor gas turbines with a total capacity of 600 MW. The facility includes all necessary auxiliary equipment including a new natural gas reducing and handling facility and water treatment facilities.

Power generated at the manufacturer standard voltage for the CTG is stepped up through main transformers and fed to the utility unified grid via an onsite 220 kV Gas Insulated Switchyard (GIS). The project was executed through a lump sum turnkey contract. The project utilized an EPC contracting plan.

West Damietta Power Plant 4X125 MW

West Damietta power project is a simple cycle power generation project located within the vicinity of the existing West Damietta power station. It consists of four outdoor gas turbines with a total capacity of 500 MW. The facility includes all necessary auxiliary equipment including a new natural gas reducing and handling facility and wastewater treatment facilities. Power generated at the manufacturer standard voltage for the CTG is stepped up through main transformers and fed to the utility unified grid via an onsite 220 kV Gas Insulated Switchyard (GIS). The project was executed through a lump sum turnkey contract.

Damietta Power Plant 4X125 MW

Damietta power project is a simple cycle power generation project located near the vicinity of the existing Damietta power station. It consists of four outdoor gas turbines with a total capacity of 500 MW.

The facility includes all necessary auxiliary equipment including a new natural gas reducing and handling facility and wastewater treatment facilities.

Power generated at the manufacturer standard voltage for the CTG is stepped up through main transformers and fed to the utility unified grid via an onsite 220 kV Gas Insulated Switchyard (GIS). The project was executed through a lump sum turnkey contract.

The project utilized an EPC contracting plan.

Al Shabab Power Plant 8X125 MW

Al Shabab power project is a simple cycle power generation project located near the vicinity of the existing Al Shabab power station.

It consists of eight outdoor gas turbines with a total capacity of 1000 MW.

The facility includes all necessary auxiliary equipment including a new natural gas reducing and handling facility and wastewater treatment facilities.

Power generated at the manufacturer standard voltage for the CTG is stepped up through main transformers and fed to the utility unified grid via an onsite 220 kV Gas Insulated Switchyard (GIS). The project was executed through a lump sum turnkey contract.

The project utilized an EPC contracting plan.

Baiji Power Plant 1014 MW (6XSGT5-PAC 2000E, Dual Fuel + Heavy Fuel Oil

Baiji power project is a 1014 MW gas fired simple cycle power generation project of appx 1014 MW at BAIJI, Iraq. The Contractor was engaged to provide engineering, procurement and construction services to the Owner. These included the design, manufacture, delivery, erection and installation of equipment including gas turbine-generator sets supplied by SIEMENS, engineering and design for balance of plant (BOP) items, tie-in to existing infrastructure, painting, setting to work, BOP commissioning and testing, and providing training programs for plant personnel in equipment design, operation and maintenance within the scope of the Contractor scope on a lump sum price basis.Baiji-Power-Plant-Project-In-Iraq-2

PGESCo teamed with Arabian Consultancy Engineering Services “ACESCo” in Libya

WESTERN MOUNTAIN EXTENSION POWER PLANT 2 X 156 MW
Completed 2013

PGESCo scope included design review, site supervision and project management of Western Mountain 2 X 156 MW project. The scope also included plant equipment material inspection and performance testing.

SARIR POWER PLANT 3 X 285 MW
Completed 2013

PGESCo scope included design review, site supervision and project management of Sarir 3 X 285 MW project. The scope also included plant equipment material inspection and performance testing.

ZWITINA POWER PLANT 2 X 285 MW
Completed 2011

PGESCo scope included design review, site supervision and project management of Zwitina 2 X 285 MW project. The scope also included plant equipment material inspection and performance testing.

ZAWIA POWER PLANT 2 X 150 MW
Completed 2007

PGESCo scope included design review, site supervision and project management of Zawia 2 X 150 MW project. The scope also included plant equipment material inspection and performance testing.

WESTERN MOUNTAIN POWER PLANT 4 X 156 MW
Completed 2007

PGESCo scope included design review, site supervision and project management of Western Mountain 4 X 156 MW project. The scope also included plant equipment material inspection and performance testing.

OBARI POWER PLANT 4 X 160 MW
On-going (on hold due to Libyan circumstances)

PGESCo scope included design review, site supervision and project management of Obari 4 X 160 MW (crude oil fired) project. The scope also included plant equipment material inspection and performance testing.