South Helwan Water Treatment Facilities

South Helwan power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens are located. The water/waste water treatment installed in South Helwan power project includes:

Intake Design Open intake
Chlorination System Chlorine Gas feed system 3 x 1300 kg cl2/h
Raw Water Pretreatment System Ultra filtration (UF) 3 x 2400 m3/day
Demineralization System Reverse Osmosis + mixed bed demineralizer 3 x 1200 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 3 x 900 m3/h
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 1920 m3/day
Potable water treatment UF + activated carbon filtration+ chlorination 100 m3/day
Sewage treatment plant Extended aeration 100 m3/day

New Capital Water Treatment Facilities

New Capital power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for HRSG feed as well as various power plant users. City water is supplied via pipe line to feed the water treatment system. The water/waste water treatment installed in New Capital power project includes:

Pretreatment System Ultra filtration (UF) 3 x 1800 m3/day
Desalination System reverse Osmosis (RO) system 3 x 1200 m3/day
Demineralization System Electro Deionization 3 x 960 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2 x 480 m3/day
Sewage treatment plant Extended aeration STP 2 x 100 m3/day

 

Burullus Desalination And Water Treatment Facilities

Burullus power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for HRSG feed as well as various power plant users. Sea water from Mediterranean Sea is supplied via intake structure to feed the desalination system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/waste water treatment installed in Burrulus power project includes:

Intake Design Open intake
Chlorination System On-site Hypochlorite Generation 3 x 40kg/hr Cl2
Pretreatment System Ultra filtration (UF) 3 x 2760 m3/day
Desalination System Double Pass reverse Osmosis (RO) system with energy recovery system 3 x 1,000 m3/day
Demineralization System Electro deionization 3 x 960 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2 x 480 m3/day
Potable water treatment Activated carbon filters/remineralization filters 2 x 100 m3/day
Sewage treatment plant Extended aeration STP 2 x 100 m3/day

Banha Water Treatment Facilities

Banha power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Banha power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification + Ultra filtration (UF) 2280 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 3 x 1800 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2400 m3/day
Potable water treatment UF + Activated carbon filtration + chlorination 100 m3/day
Sewage treatment plant Packaged Type – Extended aeration 100 m3/day

Giza North Water Treatment Facilities

Giza North power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Giza North power project includes:

Intake Design Open intake
Chlorination System Chlorine Gas feed system 3 x 1200 kg Cl2/h
Raw Water Pretreatment System Clarification + Ultra filtration (UF) 3 x 2520 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 3 x 2040 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 5280 m3/day
Potable water treatment UF + activated carbon filtration+ chlorination 80 m3/day
Sewage treatment plant Extended aeration 80 m3/day

Cairo West Water Treatment Facilities

Cairo West power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Cairo West power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification / Multi Media Filtration 2 x 2400 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 2 x 1200 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 2 x 450 m3/h

Sidi Krir Water Treatment Facilities

Sidi Krir power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Sea water from Mediterranean Sea is supplied via intake structure to feed the existing desalination plant and water/wastewater treatment system through power plant pump house where supply pumps and sea water screens are located. The desalination and water/waste water treatment installed in Sidi Krir power project includes:

Intake Design Open intake
Chlorination System On site hypochlorite generation 2 x 250 kg/hr
Demineralization System mixed bed deionizer 2 x 1560 m3/day

El Tebbin Water Treatment Facilities

El Tebbin power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Al Tebbin power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification / Multi Media Filtration 2 x 2400 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 2 x 1200 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 2 x 435.6 m3/h
Waste water treatment system Oil separation 1 x 80 m3/h and 1 x 25 m3/h

Kureimat Water Treatment Facilities

Kureimat power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The desalination and water/waste water treatment installed in El Kureimat power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification / Multi Media Filtration 3 x 2400 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 3 x 1500 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment WW 2 x 1440 m3/day

Oil Sep 100 m3/h

Potable water treatment Activated carbon filtration+ chlorination 20 m3/h

Talkha Water Treatment Facilities

Talkha power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. River water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Talkha power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification / Multi Media Filtra-tion 2 x 2800 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 2 x 2160 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2 x 580 m3/day

Nubaria Water Treatment Facilities

Nubaria power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. River water from Nubaria canal is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The desalination and water/waste water treatment installed in Nubaria power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification / Multi Media Filtration 3 x 2016 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 3 x 1500 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2 x 1440 m3/day
Potable water treatment Activated carbon filters and disinfection with sodium hypochlorite dosing 400 m3/day
Sewage treatment plant Extended Diffused Aeration system 2 × 200 m3/day

Cairo North Water Treatment Facilities

 

Cairo North power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. River water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Cairo North power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification / Multi Media Filtration /Sludge Dewatering 2 x 1680 m3/day
Demineralization System Cation / degasifier /anion / mixed bed deionizer 2 x 1680 m3/day
Waste water treatment system API Oil separation / DAF oil separation 2400 m3/day

Al Atf Water Treatment Facilities

Al Atf power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. River water from Nile River Rosetta Branch is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The desalination and water/waste water treatment installed in Al Atf power project includes:

Intake Design Open intake
Chlorination System Hypochlorite Solution injection system
Raw Water Pretreatment System Clarification / Multi Media Filtration 2 x 80 m3/hr
Demineralization System Cation / degasifier /anion / mixed bed deionizer 2 x 1300 m3/day
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2 x 840 m3/day

New West Damietta Desalination and Water Treatment Facilities – Fast Track

New West Damietta Fast Track power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Ground Water is supplied via deep well field to feed the desalination and water treatment systems. The desalination and water/waste water treatment installed in West Damietta power project includes:

Pretreatment System Ultra filtration modules (UF) 3 x 3250 m3/day
Desalination System Double pass reverse osmosis (brackish water) 3 x 2400 m3/day
Demineralization System Electro deionization System 3 x 1800 m3/day
Condensate polisher System Pre-coat filters 2 x 600 m3/h On-going
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2400 m3/day
Potable water treatment UF + RO + Activated carbon + Chlorination 100 m3/day
Sewage treatment plant Extended aeration 100 m3/day

New Assiut Desalination And Water Treatment Facilities – Fast Track

New Assiut Fast Track power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Ground Water is supplied via deep well field to feed the desalination and water treatment systems. The desalination and water/waste water treatment installed in West Damietta power project includes:

Pretreatment System Ultra filtration mod-ules (UF) 4 x 5040 m3/day
Desalination System Double pass reverse osmosis (brackish water) (12,000 m3/day)
5 x 2400 m3/day
Demineralization System Electro deionization System 4 x 2400 m3/day
(12,000 m3/day)
Condensate polish-er System Pre-coat filters 2 x 600 m3/h On going
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 1920 m3/day
Potable water treatment UF + RO + activated carbon+ chlorination 100 m3/day
Sewage treatment plant Extended aeration 100 m3/day

Suez Desalination And Water Treatment Facilities

Suez power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Sea water from Red sea is supplied via intake structure to feed the desalination system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/waste water treatment installed in Suez power project includes:

Intake Design Open intake
Chlorination System On site hypochlorite generation system 2 x 300 kg cl2/h
Raw Water Pretreatment System Multi Effect Distillation with Thermal Vapor compression (MED-TVC) 6,000 m3/day
Demineralization System Mixed bed deionizer 3 x 1080 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 2 x 900 m3/h
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 2400 m3/h

West Damietta Desalination And Water Treatment Facilities

West Damietta power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Ground Water is supplied via deep well field to feed the desalination and water treatment systems. The desalination and water/waste water treatment installed in West Damietta power project includes:

Pretreatment System Ultra filtration modules (UF) 2 x 2880 m3/day
Desalination System Double pass reverse osmosis (brackish water) 2 x 1560 m3/day
Demineralization System Mixed bed deionizer 2 x 1560 m3/day
Condensate polisher System Pre-coat filters 2 x 600 m3/h
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 1200 m3/day

El Ain El Sokhna Desalination And Water Treatment Facilities

El Ain El Sokhna power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Sea water from Red sea is supplied via intake structure to feed the desalination system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/waste water treatment installed in El Ain El Sokhna power project includes:

Intake Design Open intake
Chlorination System On-site Hypochlorite generation system 3 x 450 kg cl2/h
Desalination System Multi Effect Distillation with Thermal Vapor compression (MED-TVC) 8,000 m3/day
Demineralization System Mixed bed deionizer 1800 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 6 x 760 m3/h
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 1440 m3/day
Sewage treatment plant Extended aeration 2040 m3/day

 

 

 

Abu Qir Desalination And Water Treatment Facilities

Abu Qir power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Sea water from Mediterranean sea is supplied via intake structure to feed the desalination system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/waste water treatment installed in Abu Qir power project includes :

Intake Design Open intake
Chlorination System On-site Hypochlorite generation system 2 x 500 kg cl2/h
Desalination System Multi Effect Distillation with Thermal Vapor compression (MED-TVC) 10,000 m3/day
Demineralization System Mixed bed deionizer 2 x 3000 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 2 x 880 m3/h
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 240 m3/day
Sewage treatment plant Extended Aeration 200 m3/day

Al Shabab Desalination And Water Treatment Facilities

Al Shabab power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Ground Water is supplied via deep well field to feed the desalination and water treatment systems. The desalination and water/waste water treatment installed in Al Shabab power project includes:

Pretreatment System Ultra filtration modules (UF) 3 x 3500 m3/day
Desalination System Double pass reverse osmosis (brackish water) 2 x 3750 m3/day
Demineralization System Mixed bed deionizer 2 x 3120 m3/day
Condensate polisher System Pre-coat filters 4 x 600 m3/h
Waste water treatment system Oil separation / clarification / filtration / pH adjustment 1200 m3/day
Potable water treatment UF + RO + Activated carbon + Chlorination 120 m3/day
Sewage treatment plant Extended aeration 120 m3/day

 

Ayoun Mousa Desalination And Water Treatment Facilities

Ayoun Moussa power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Sea water from Red sea is supplied via intake structure to feed the desalination system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/waste water treatment installed in Ayoun Moussa power project includes :

Intake Design Open intake
Chlorination System On-Site Hypochlorite Generation System 3 x 110 kg/hr Cl2
Desalination System Multi Effect distillation (MED) 2 x 5000 m3/day
Demineralization System Mixed bed deionizer 3 x 1500 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 3 x 522 m3/h
Waste water treatment system Oil separation / DAF system 2400 m3/day

Sidi Krir 1&2 Desalination And Water Treatment Facilities

SIDI KRIR 1 & 2 power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Sea water from Mediterranean Sea is supplied via intake structure to feed the desalination system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/waste water treatment installed in Sidi Krir power project includes:

Intake Design Open intake
Chlorination System On-Site Hypochlorite Gen-eration System 3 x 110 kg/hr Cl2
Desalination System Multi stage flash distillation (MSF) 2 x 5000 m3/day
Demineralization System Mixed bed deionizer 3 x 1500 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 3 x 522 m3/h
Waste water treatment system Oil separation / DAF system 2400 m3/day

Zawia Desalination Project (80,000 M3/Day)

Complete 2010
PGESCo scope included design review, site supervision and project management of Zawia Sea Water Desalination Project. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).

Derna Sea Water Desalination Project (40,000 M3/DAY)

Completed 2010
PGESCo scope included design review, site supervision and project management of Derna Sea Water Desalination Project. The scope also included plant equipment material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).