West Damietta power project is a simple cycle power generation project located within the vicinity of the existing West Damietta power station. It consists of four outdoor gas turbines with a total capacity of 500 MW. The facility includes all necessary auxiliary equipment including a new natural gas reducing and handling facility and wastewater treatment facilities. Power generated at the manufacturer standard voltage for the CTG is stepped up through main transformers and fed to the utility unified grid via an onsite 220 kV Gas Insulated Switchyard (GIS). The project was executed through a lump sum turnkey contract.
Project Details | |
Owner | East Delta Electricity Production Company |
Location | Damietta, Egypt |
Date of Award | March 2011 |
Contractual Duration | 11 months |
Scope | Design review, project management, construction management, startup and commissioning management. |