New Capital power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for HRSG feed as well as various power plant users. City water is supplied via pipe line to feed the water treatment system. The water/waste water treatment installed in New Capital power project includes:
Pretreatment System | Ultra filtration (UF) | 3 x 1800 m3/day |
Desalination System | reverse Osmosis (RO) system | 3 x 1200 m3/day |
Demineralization System | Electro Deionization | 3 x 960 m3/day |
Waste water treatment system | Oil separation / clarification / filtration / pH adjustment | 2 x 480 m3/day |
Sewage treatment plant | Extended aeration STP | 2 x 100 m3/day |
Project Details | |
Owner | Cairo Electricity Production company |
Client | Orascom Construction |
Location | New Capital, Egypt |
Date of Award | August 2015 |
Scope | Detailed Engineering, Procurement Support, and Design Review |