Banha power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Raw water Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Banha power project includes:
Intake Design |
Open intake |
|
Chlorination System |
Hypochlorite Solution injection system |
|
Raw Water Pretreatment System |
Clarification + Ultra filtration (UF) |
2280 m3/day |
Demineralization System |
Cation / degasifier /anion / mixed bed deionizer |
3 x 1800 m3/day |
Waste water treatment system |
Oil separation / clarification / filtration / pH adjustment |
2400 m3/day |
Potable water treatment |
UF + Activated carbon filtration + chlorination |
100 m3/day |
Sewage treatment plant |
Packaged Type – Extended aeration |
100 m3/day |