Talkha power project includes water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. River water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/waste water treatment installed in Talkha power project includes:
Intake Design |
Open intake |
|
Chlorination System |
Hypochlorite Solution injection system |
|
Raw Water Pretreatment System |
Clarification / Multi Media Filtra-tion |
2 x 2800 m3/day |
Demineralization System |
Cation / degasifier /anion / mixed bed deionizer |
2 x 2160 m3/day |
Waste water treatment system |
Oil separation / clarification / filtration / pH adjustment |
2 x 580 m3/day |