Sidi Krir 1&2 Desalination And Water Treatment Facilities

Region:

Status:

SIDI KRIR 1 & 2 power project includes desalination and water/waste water treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well as various power plant users. Sea water from Mediterranean Sea is supplied via intake structure to feed the desalination system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/waste water treatment installed in Sidi Krir power project includes:

Intake Design Open intake
Chlorination System On-Site Hypochlorite Gen-eration System 3 x 110 kg/hr Cl2
Desalination System Multi stage flash distillation (MSF) 2 x 5000 m3/day
Demineralization System Mixed bed deionizer 3 x 1500 m3/day
Condensate polisher System Externally Regenerated Mixed Beds 3 x 522 m3/h
Waste water treatment system Oil separation / DAF system 2400 m3/day
Project Details
Owner West Delta Electricity Production Company
Location North Coast, Egypt
Date of Award April 1996
Contractual Duration 26 Months
Scope Engineering, Procurement, and Construction Management Services